Cablanico's beaver in a hard hat in a bathroom showroom, beside a handwritten note: Suppliers, Showrooms, Contractors, Services. All in one place.

The B2B construction network

You Just Found Your Construction B2B Network.

Discover subcontractors, suppliers, showrooms and professional services, all in one place, built for construction professionals.

  • Free to searchSign up free
  • Built forconstruction pros
  • B2B networkIn your county
Explore the Construction Network

for Developers & Project Owners

General Contractors in Ventura County

8listings

Public directory

PT
Pine Tree Design & Construction Inc
General Contractors
BV
BUILD VENTURA LLC
General Contractors
D
Doobek
General Contractors
PC
POWERHOUSE CONSTRUCTION
General Contractors
DS
DCW Services Inc
General Contractors

408 E Aliso St, Ojai, CA 93023

MW
M W Faust General Contractor
General Contractors
SC
Safeway Construction
General Contractors
CC
California Custom Builders
General Contractors

Other trades you may need in Ventura County

General contractors take single-point responsibility for delivering a building: buying out and managing the subcontractor trades, running the schedule, holding quality and safety on site, and closing out permits and warranties. For a developer or project owner, the GC decision is the largest single award on the project, and the selection process deserves the same rigor as the land deal. Prequalification comes first: audited or CPA-prepared financial statements, a surety letter stating single-project and aggregate bonding capacity, safety record, current workload, litigation history, and completed projects genuinely comparable in type and size. A GC who builds tenant improvements well is not automatically the right hand for ground-up multifamily. Contract structure is the second decision. Fixed price transfers cost risk to the GC and works best when drawings are complete; cost-plus with a guaranteed maximum price fits projects that start buyout before documents are finished, and it should come with audit rights, an agreed definition of reimbursable costs, and a negotiated split of savings. Whichever structure is used, the schedule of values becomes the backbone of payment: review it before the first billing for front-loading, and pair every progress payment with conditional and unconditional lien waivers from the GC and its subs. Retention held on progress payments is standard practice, with release tied to completion milestones. During construction, the owner's practical control lives in the pay application cycle, so a disciplined review process matters more than any single contract clause. In California, general building work typically requires the CSLB Class B General Building classification. Before award, we recommend confirming license status through the CSLB public lookup, verifying insurance including builder's risk arrangements, and confirming bonding capacity directly with the surety.