Cablanico's beaver in a hard hat in a bathroom showroom, beside a handwritten note: Suppliers, Showrooms, Contractors, Services. All in one place.

The B2B construction network

You Just Found Your Construction B2B Network.

Discover subcontractors, suppliers, showrooms and professional services, all in one place, built for construction professionals.

  • Free to searchSign up free
  • Built forconstruction pros
  • B2B networkIn your county
Explore the Construction Network

for Builders & GCs

Drywall Contractors in Ventura County

8listings

Public directory

SD
Sierra Drywall Inc
Drywall Contractors
DE
DRYWALL EXPERT INC
Drywall Contractors
GJ
GARCIA JB PLASTERING
Drywall Contractors
AD
ATTENTIVE DRYWALL
Drywall Contractors
JC
JTAP CONSTRUCTION INC
Drywall Contractors
SC
SO CAL INDEPENDENT DRYWALL INC
Drywall Contractors
TD
805 TOPS DRYWALL AND CONCRETE
Drywall Contractors
RR
RATED R CONSTRUCTION
Drywall Contractors

Other trades you may need in Ventura County

Drywall subcontractors hang gypsum board, tape and finish joints, and apply texture on residential and commercial projects, and many also frame nonstructural metal studs and ceilings on commercial work. General contractors and builders slot drywall at a hinge point in the schedule: board cannot go up until mechanical, electrical, and plumbing rough-ins have passed inspection and any insulation cover inspection is signed off, and once it is up, every trade behind those walls is done or working through access panels. The scope usually lands in overlapping phases per area: stocking, hanging, taping and finishing, texture, then a point-up pass after other trades have banged up the walls. Before the crew hangs, walk the job for backing and blocking, since missing backing for cabinets, grab bars, and wall-mounted equipment discovered after board is up means cutting it back open. Finishing quality is where expectations need to be set in writing. The Gypsum Association's finish levels are the industry language: Level 4 is the standard for most painted walls, while Level 5 belongs on surfaces under critical lighting, with gloss or dark paint, where joint shadowing would otherwise telegraph. Agree on the level per surface in the subcontract, and on how finish gets judged, since the industry standard is viewing from a normal distance under the lighting the space will actually have, not a flashlight held against the wall. Temperature and humidity affect joint compound drying, so condition the building before finishing starts in cold or damp weather. Before award, we recommend confirming license and insurance status: in California, drywall work typically falls under the CSLB C-9 Drywall classification, with a free public lookup at cslb.ca.gov. Texas has no statewide license for drywall, though many cities require contractor registration for permitted work.