Cablanico's beaver in a hard hat in a bathroom showroom, beside a handwritten note: Suppliers, Showrooms, Contractors, Services. All in one place.

The B2B construction network

You Just Found Your Construction B2B Network.

Discover subcontractors, suppliers, showrooms and professional services, all in one place, built for construction professionals.

  • Free to searchSign up free
  • Built forconstruction pros
  • B2B networkIn your county
Explore the Construction Network

for Builders & GCs

11 Flooring Contractors in San Diego County

Public directory

CF
Coles Fine Flooring
Flooring Contractors
SD
SAN DIEGO FLOORING PROS INC
Flooring Contractors
NF
NICHOL FLOOR CO
Flooring Contractors
TF
Thor Flooring Inc
Flooring Contractors
QP
QUALITY PRO FLOORING INC
Flooring Contractors
PF
PRO FLOORING CENTER
Flooring Contractors
SD
SAN DIEGO FLOORING EXPRESS
Flooring Contractors
CF
CA Floors
Flooring Contractors
SD
SAN DIEGO FLOORING INC
Flooring Contractors
MW
Matt Walsh Wood Floors
Flooring Contractors

10 / 11

Other trades you may need in San Diego County

Flooring subcontractors prepare substrates and install carpet, resilient sheet and tile, luxury vinyl plank, and wood flooring, including sanding and finishing, on residential and commercial projects. General contractors and builders bring the flooring sub in near the end of the job, after drywall, paint, and ceiling work, and the trade's position that late in the schedule means any delay lands directly on turnover dates. The hand-off that causes the most trouble is the slab itself. Moisture-sensitive products fail on damp concrete, so the sequence of moisture testing, remediation if readings come back high, and written acceptance of the substrate needs an owner before install day, and flooring manufacturers commonly condition their warranties on documented test results. Slab flatness works the same way: correcting high and low spots is generally treated as the responsibility of the GC or the concrete sub, while the flooring contractor verifies conditions and prices any additional leveling. Material acclimation is the other recurring pitfall. Wood and many resilient products need conditioned space, with HVAC running, for a period before and during installation, which forces coordination with the mechanical contractor and the commissioning schedule. When comparing bids, check what is actually carried: floor prep allowances, moisture mitigation, transitions and base, stair work, furniture or fixture handling, and protection of finished floors while other trades complete punch work. In California, this scope typically falls under the CSLB C-15 Flooring and Floor Covering classification, which covers the materials above but excludes ceramic tile. Before award, we recommend confirming that the subcontractor's license classification and status are current and that liability and workers' comp insurance are in place; CSLB publishes a free public license lookup.